SFO Terminal 2 Air Traffic Control Tower Demolition and Terminal Improvements, San Francisco, CA

Role: Prime Architect (JV)
Size: 138,000 sf
Completion: 2018 (est.)
Renderings:
AE3 Partners/Woods Bagot
 

The Turner/AE3/Woods Bagot Design-Build team was selected for the Terminal 2 Air Traffic Control Tower Demolition and Terminal Improvements Project. The project involves the demolition of the existing Air Traffic Control Tower cab and reconstruction of the office tower third and fourth floors into a core and shell space, including the addition of an outdoor observation deck, restroom, and support spaces. The project area has a LEED Gold Target.